Skip to product information
GC Gold Label Hybrid Shade A2

Versatile material for dental restorations.

4.0
(15)
Sale price  Rs. 2,995.00 Regular price  Rs. 3,850.00
Taxes included. Shipping calculated at checkout.
Shade

What's Inside

1 items
FREE Delivery
Jul 10 - Jul 15
Order within
-- h : -- m

HUMAN SKIN LIKE

Same day Shipping

READY TO USE

Beginer Friendly

Key Specifications

Powder/ Liquid Ratio (g/g) - 3.0/1.0

Mixing Time (sec.) - 25-30"

Working Time (23°C/73° F) (min., sec.) - 1'45"

Net Setting Time (37°C/99°F) (min., sec.) - 2'40"

Finishing Time (37 C/99 F, from start of mixing) (min., sec.) - 6'00"



STORAGE : Recommended for optimal performance, store at temperature of 4-25°C (39-77°F).

Direction To Use

1. POWDER AND LIQUID DISPENSING a) The standard powder to liquid ratio is 3.0 g/1.0g (1 level scoop of powder to 1 drop of liquid). b) For accurate dispensing of powder, lightly tap the bottle against the hand. Do not shake or invert. c) Hold the liquid bottle vertically and squeeze gently. d) Immediately close the bottles tightly after use.

2. CAVITY PREPARATION a) Prepare tooth using standard techniques. Extensive mechanical retention is unnecessary. For pulp capping, use calcium hydroxide.  Note: Optionally, CAVITY CONDITIONER or DENTIN CONDITIONER can be applied to the bonding surfaces. b) Rinse thoroughly with water. Blot away excess water with a cotton pellet or dry by gently blowing with an air syringe. DO NOT DESICCATE. Prepared surfaces should appear moist (glistening).

3. MIXING a) Dispense powder and liquid onto the pad. b) Using plastic spatula, divide the powder into 2 equal parts. c) Mix the first portion of the powder with all the liquid for 10 seconds. d) Incorporate the remaining portion of the powder and mix thoroughly for 15-20 seconds

4. RESTORATIVĒ TECHNIQUE a) Mix the required amount of cement. Working time is 145 from start of mixing at 23C (73"F). Higher temperatures will shorten working time. b) Transfer cement to the prepared cavity using a suitable instrument. Avoid air bubbles c) Form the preliminary contour and cover with a matrix if required d) When set, immediately apply GC Fuji VARNISH (blow dry) or G-COAT PLŪS (light cure)

5. FINISHING a) Final finishing under water spray using standard techniques can begin at 6 minutes after starting the mix. b) Apply a final coat of GC Fuji VARNIŠH or G-COAT PLUS. c) Instruct the patient not to apply pressure for 1 hour.

 

Packaging
{"type":"root","children":[{"type":"list","listType":"unordered","children":[{"type":"list-item","children":[{"type":"text","value":"1 x 15gm powder"}]},{"type":"list-item","children":[{"type":"text","value":"1 x 6.4ml liquid"}]}]}]}
Additional Info

Country of Origin: Japan
Manufacturer: GC Corporation

Payment Options

COD
Net Banking
UPI
Wallet
Cards
EMI

AeDental Benefits

Free
Shipping
Hassle Free
Cancellation
10 Days
Replacement
100%
Genuine

Got Any Doubts?

What are the clinical applications for this hybrid material?

This material is suitable for a wide range of dental procedures, including cementation, lining, and core build-up.

What is the recommended powder-to-liquid ratio and mixing time?

The standard ratio is 3.0g powder to 1.0g liquid, mixed for a total of 25-30 seconds.

When can final finishing begin?

Final finishing under water spray can begin approximately 6 minutes after the start of mixing.

What are the recommended storage conditions?

For optimal performance, this product should be stored at a temperature between 4°C and 25°C (39°F and 77°F).

What are some key properties of this restorative material?

This material continuously releases fluoride and is radiopaque for clear identification on radiographs. It also has low solubility and forms a strong bond to tooth structure to reduce microleakage.

Related Products